Commercial building

Project information

Location

Veldhoven

Constituent

Veldvast B.V.

Architect

Van Aken Architecten

Assignee

Bouwers Met Visie

Partners

Glassolutions Nederland
Reynaers B.V.

Year produced

2011

Commercial building (1/5)Commercial building (2/5)Commercial building (3/5)Commercial building (4/5)Commercial building (5/5)
  • 5.665 m2 Luxalon Quadro Clad façade cladding
  • 2.870 m2 DRL curtain wall
  •    800 m2 louvre screens including explosion shutters
  •    780 m1 edge finishing
  •    500 m2 steel curtain wall, 60 minutes fire-resistant
  •    380 m1 aluminium framing
  •    240 m1 steel roof construction
  •    240 m1 stainless steel hand rail
  •    396 m2 aluminium curtain wall
  •    221 number of structural glazed concealed top-side hung windows
  •    135 m2 Storax transformer doors
  •    130 m2 fixed Storax façade grids
  •    130 m2 GNS fire awnings, 60 minutes fire-resistant
  •     50 m2 steel windows and doors
  • Steel inner- and front doors, 60 minutes and 90 minutes fire-resistant